Updated Nov 24, 2026
Did not come true
“Intel will give up on manufacturing and catch up to AMD (maybe towards the end of the year or the one after).”

Normalized claim: Intel will abandon semiconductor manufacturing and catch up to AMD towards the end of 2021 or in 2022.

domano · Made Jan 1, 2021 · about 2021–2022 · in Ask HN: Predictions for 2021? ↗ · View original comment ↗

What actually happened

Intel did not abandon semiconductor manufacturing; instead, it continued manufacturing chips in-house and pursued aggressive process node roadmaps (e.g., Intel 7, Intel 20A, and Intel 18A).

The prediction claimed Intel would give up on semiconductor manufacturing by end of 2021 or 2022. The evidence demonstrates that in July 2021 Intel unveiled an extensive future manufacturing node roadmap (Intel 20A and 18A) and released multiple nodes manufactured internally (such as Alder Lake on Intel 7 in late 2021 and Raptor Lake in 2022).

Verified public sources

  1. 2 nm process ↗ — In July 2021, Intel unveiled its process node roadmap from 2021 onwards, confirming its 2 nm process node called 'Intel 20A' scheduled for volume production in 2024 and Intel 18A for 2025.
  2. List of Intel CPU microarchitectures ↗ — Intel released Alder Lake on the Intel 7 process on November 4, 2021, followed by Raptor Lake on the Intel 7 process on October 20, 2022.
Impact 7/10

Intel giving up fab manufacturing would alter global semiconductor geopolitics and chip manufacturing economics.

Boldness 4/5

Forecasting that Intel would abandon internal manufacturing was deeply contrarian to its foundational business model.

Specificity 4/5

Names the specific company, concrete corporate action, competitive benchmark against AMD, and an explicit time window.

Part of recurring topic cluster: CPU Architecture Shifts and Semiconductor Market Share →

Original Hacker News context