Updated Nov 24, 2026
Did not come true
“I think the new 3nm process from TSMC will help to accelerate new NVIDIA cards to support GPT like AI”

Normalized claim: TSMC's new 3nm manufacturing process will accelerate new NVIDIA graphics cards designed to support GPT-like AI in 2023.

tmaly · Made Dec 31, 2022 · about 2023 · in Ask HN: What are your predictions for the world in 2023? ↗ · View original comment ↗

What actually happened

In 2023, TSMC began volume production of its 3nm node (N3/N3E), but NVIDIA did not release 3nm AI or graphics cards that year. NVIDIA's prevailing architectures (such as Ada Lovelace and Hopper) were manufactured on TSMC's 4N process node (a 5nm class node), with subsequent 3nm and 4nm Blackwell/RTX 50-series chips not launching until 2024-2025.

The prediction claimed that TSMC's new 3nm process would accelerate new NVIDIA cards for GPT-like AI in 2023. While TSMC entered 3nm production, NVIDIA's GPUs during 2023 were built on TSMC's 4N process rather than TSMC's 3nm process.

Verified public sources

  1. 3 nm process ↗ — On 29 December 2022, TSMC announced that volume production using its 3 nm semiconductor node (N3) was underway.
  2. List of Nvidia graphics processing units ↗ — Nvidia GPUs of that era were built on the TSMC 4N process, with subsequent Blackwell/RTX 50 series laptops not showcased until CES 2025.
Impact 7/10

Accelerating cutting-edge AI silicon directly affected the explosive multitrillion-dollar AI infrastructure wave.

Boldness 3/5

Predicting NVIDIA would ship commercial 3nm hardware so quickly in 2023 was optimistic given typical semiconductor roadmaps.

Specificity 4/5

Names specific manufacturing processes (TSMC 3nm), target vendors (NVIDIA), application domain (GPT-like AI), and a year.

Original Hacker News context