Updated Nov 24, 2026
Partially true
“The shortage of high-end GPUs starts to ease as new fabs come online, but the industry faces a new bottleneck in networking equipment and specialized AI accelerators.”

Normalized claim: In 2025, the shortage of high-end GPUs will begin to ease as new semiconductor fabrication plants come online, while a new bottleneck emerges in networking equipment and specialized AI accelerators.

solidr53 · Made Dec 23, 2024 · about 2025 · in Ask HN: Predictions for 2025? ↗ · View original comment ↗

What actually happened

GPU supply constraints persisted not due to raw front-end wafer fabrication, but because of severe bottlenecks in CoWoS packaging, HBM, high-speed optical networking, and power infrastructure.

Networking and specialized infrastructure bottlenecks did emerge as predicted, though overall GPU shortages did not simply ease smoothly as packaging bottlenecks persisted.

Verified public sources

  1. Chip competition obscures where value really accumulates: one layer down ↗ — TSMC CoWoS advanced packaging capacity and power delivery represented the largest constraints on AI accelerator supply in 2025.
4.0 / 22.0 (× 0.5 for partially true)
How scores work →
Impact 6/10

Shifts in AI infrastructure bottlenecks dictate billions in enterprise hardware procurement.

Boldness 3/5

Predicting the easing of top-tier GPU constraints in late 2024 was somewhat contrary to prevailing shortages.

Specificity 3/5

Specifies the precise hardware components (GPUs, networking, accelerators) and timing.

Part of recurring topic cluster: Processor Performance and Moore's Law →

Original Hacker News context